Most of the windows are in. The big picture window in the great room was installed Friday morning with the forklift and a few guys! I was busy packing up for our camping weekend so I didn't get over there to take pictures of the ordeal. It was probably best that I didn't!
Front windows and door. We're looking forward to sitting in front of those on the veranda!
The view of the dining room.
The interior insullation began this morning, apparently the drywallers could possibly start on Friday! The plumbers are installing pipes in the basement for the laundry room and bathroom. It will be a while before the in-floor heat is installed in the basement. Ron said it's still pretty mushy down there, not sure how long it will take for it to dry out. Everytime I think the house is humming along I remember the basement floor still needs to be done and then I'm brought back to reality. It may not delay the move-in date, it's just shuffled the work order around, maybe??
No comments:
Post a Comment